Case Study – M5 Slab Replacement

A recent case study produced by Volumetric Concrete Australia on the M5 Slab Replacement Project.

There are numerous concrete slab sections along the M5 motorway which require rehabilitation. As part of the current upgrade, Interlink roads engaged Antoun Civil Engineering in conjunction with Volumetric Concrete Australia to replace a critical slab beneath Moorebank Avenue bridge as the location would have proven difficult to replace due to the nature of its location. The slab was saw cut, demolished, doweled and replaced within a 7 hour closure with an opening strength of 32MPa ready for trafficking.

Click here to open.